This documentation records the analysis and design of Project Manager, Procurement and Asset Information System. The system is build to integrate the workflow within Project Manager, Procurement and Asset division in Schlumberger Information Solutions, Infrastructure Services sub segment. This analysis document covers problem analysis, requirement analysis, logical design, and physical design of this information system. A narrative user interface design and navigational flow are also included in this document. This document is written based on Waterfall Development Methodology.