Your search for 41548 returns 3095 document(s) |
Permissible delay in payments in the two-echelon inventory system with controllable setup cost and lead time under service level constraint, 193-211 |
Author: R. Uthayakumar, S. Priyan | Type: Indeks Artikel Jurnal
|
Find Similar |
Add To Favorites |
Detail in New Window
|
A minimax distribution free procedure for a multi-constraint inventory model with deterministic variable lead time, page 175-192 |
Author: Aref Gholami-qadikoloei, Abolfazl Mirzazadeh | Type: Indeks Artikel Jurnal
|
Find Similar |
Add To Favorites |
Detail in New Window
|
An LMI Approach to Guaranteed Cost Filter for Uncertain Neutral Systems with Time-varying Delay (125-130) |
Author: Erwin Susanto
Mitsuaki Ishitobi; | Call Number: SEM-319 | Type: Indeks Artikel prosiding/Sem
|
Find Similar |
Add To Favorites |
Detail in New Window
|
An Inventory Model For Grain And Oil With Service Level (V2-395--V2-398) |
Author: Xu Degang
Xiao Renbin; | Call Number: SEM-328 | Type: Indeks Artikel prosiding/Sem
|
Find Similar |
Add To Favorites |
Detail in New Window
|
Implementasi prototipe modul company setup, GL exchange rate, GL cost allocation, dan account receivable dalam rapid accouinting system (RACS)/ Edwin |
Author: Edwin; | Call Number: KP-0426 | Type: Kerja Praktek (KP)
|
Find Similar |
Add To Favorites |
Detail in New Window
|
A Retrial inventory system with Non-preemptive priority service, 57-77 |
Author: K. Jeganathan, N. Anbazhagan, J. Kathiresan | Call Number: Vol. 24 (2013): 1 | Type: Indeks Artikel Jurnal
|
Find Similar |
Add To Favorites |
Detail in New Window
|
Pengembangan service level management system PT. IBM Indonesia |
Author: Darien Hamidjaja; | Call Number: KP-2160 (Softcopy KP-1722) | Type: Kerja Praktek (KP)
|
Find Similar |
Add To Favorites |
Detail in New Window
|
Pengembangan service level management system PT. IBM Indonesia |
Author: Gary Alexander Parung; | Call Number: KP-2161 (Softcopy KP-1723) | Type: Kerja Praktek (KP)
|
Find Similar |
Add To Favorites |
Detail in New Window
|
Performance Contribution baesd scheduling framework for Precedence constraint task in real time system (557-570) |
Author: Radhakrishna Naik
R.R.Manthalkar; | Call Number: SEM-323 | Type: Indeks Artikel prosiding/Sem
|
Find Similar |
Add To Favorites |
Detail in New Window
|
Supply chain decisions under retailer-managed inventory and vendor-managed inventory systems, 233-235 |
Author: Liang-Tu Chen; | Call Number: SEM-347 | Type: Indeks Artikel prosiding/Sem
|
Find Similar |
Add To Favorites |
Detail in New Window
|