Search Result Save to File Save as CSV
Your search for 43736 returns 63 document(s)
Perencanaan strategis sistem informasi studi kasus: PT. Wisesa Mandiri Divisi manufacturing, service & maintenance
Author: Joko Nurwandi; | Call Number: T-0180 | Edition: 2000 | Type: Tesis
Find Similar |  Add To Favorites |  Detail in New Window 
An Interval Optimization Model of Multi-criteria Parameters In The Process of Selecting Manufacturing Suppliers (V2-36--V2-39)
Author: Hongfei Wang; | Call Number: SEM-328 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
Development Of A Two-Syage AMT Option Selection Model To USe In Turkish Manufacturing Companies (21)
Author: Yusuf Tansel ic Mustafa Yurdakul; | Call Number: SEM-311 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
Operator Allocation Selection In Labor-Intensive Manufacturing System Using AHP/DEA and DEA (40)
Author: Ruzanita Mat Rani Wan Rosmanira Ismail; | Call Number: SEM-311 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
Analytic Network Process Model for Sustainable Lean And Green Manufacturing Performance Indicator (97)
Author: Adam Shariff bin Adli Aminuddin Mohd Kamal bin Mohd Nawawi; | Call Number: SEM-311 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
IMPROVED PARTICLE SWARM OPTIMIZATION UNTUK MENYELESAIKAN PERMASALAHAN PART TYPE SELECTION DAN MACHINE LOADING PADA FLEXIBLE MANUFACTURING SYSTEM (FMS)
Author: Wayan Firdaus Mahmudy; | Call Number: SEM-361 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
Perancangan data warehause dan pemanfaatan teknik data mining dalam meningkatkan produktifitas di lingkungan manufacturing studi kasus: PT. Ginsa Inti Pratama
Author: Oktavianus Rante Tasak; | Call Number: PA-0125 (Softcopy PA-0125) | Edition: 2007 | Type: Proyek Akhir (PA)
Find Similar |  Add To Favorites |  Detail in New Window 
Lean Six Sigma for Manufacturing and services Industries: Strategi Dramatik Reduksi Cacat/ Kesalahan, Biaya Inventori dan Lead Time dalam waktu kurang dari 6 bulan
Author: Paspersz, Vincent; | Call Number: 658.401 Gas l | Type: Buku
Find Similar |  Add To Favorites |  Detail in New Window 
Pengembangan sistem-CAM (Computer Aided Manufacturing) berbasis model fased 3D untuk pemesinan multi-axis dengan simulasi pergerakan pahat, Hal. 332- 337
Author: Gandjar, Kiswanto; E.A. Gani; A. Mujahid; Priadhana E.K.; | Call Number: SEM-276 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
Pengembangan sistem computer aided manufacturing (CAM) berbasis model fased 3D Departemen Tekni Mesin Fakultas Teknik-Universitas Indonesia
Author: Eka Aditya; | Call Number: KP-0734 (Sofkopi KP-293) (SCKP-173) | Type: Kerja Praktek (KP)
Find Similar |  Add To Favorites |  Detail in New Window 
Prev   1 2 3 4 5 6 7  Next