Search Result Save to File Save as CSV
Your search for 9539 returns 5230 document(s)
Perancangan Penyediaan Jasa Pelayanan Project Monitoring and Controlling System pada proyek Konstruksi sipil
Author: Firdaus; | Call Number: PA-0069 (Softcopy PA-0069) | Edition: 2006 | Type: Proyek Akhir (PA)
Find Similar |  Add To Favorites |  Detail in New Window 
Analisis faktor kunci kesuksesan proyek perangkat lunak pada PT Phincon menggunakan analytical hierarchy process
Author: Deni Utama; | Call Number: KA-1259 (Softcopi KA-1252) MAK KA-905 | Edition: 2019 | Type: Karya Akhir (KA)
Find Similar |  Add To Favorites |  Detail in New Window 
Penerapan sistem agen cerdas untuk pengendalian pengeluaran biaya proyek, Hal. 387-393
Author: Nunung Nurul Qomariah dan Azhari; | Call Number: SEM-268 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
Project management: a systems approach to planning scheduling and controlling
Author: Kerzner, Harold; | Call Number: 658.404 Ker p | Type: Buku
Find Similar |  Add To Favorites |  Detail in New Window 
A feedback-Aware Valuation Of Construction Project Execution Time (103)
Author: Miroslaw Dytczak Grzegorz Ginda Barbara Jastrzabek Tomasz Wojtkiewicz; | Call Number: SEM-311 | Type: Indeks Artikel prosiding/Sem
Find Similar |  Add To Favorites |  Detail in New Window 
Project Management : 24 Point penting untuk membantu ANDA menyelesaikan Proyek apapun / Gary R. Heerkens
Author: Heerkens, Gary R.; | Call Number: 658.404 Hee p | Type: Buku
Find Similar |  Add To Favorites |  Detail in New Window 
Analisis tingkat kematangan manajemen proyek berdasarkan project management maturity model dan COBIT 5: studi kasus lembaga ABC
Author: Keri Wiroprabowo; | Call Number: KA-684 (Softcopy KA-682) MAK KA-343 | Edition: 2015 | Type: Karya Akhir (KA)
Find Similar |  Add To Favorites |  Detail in New Window 
Analisis tingkat kematangan manajemen proyek menggunakan project management maturity model: studi kasus PT X
Author: Adib Karoma Yude; | Call Number: KA-1480 (Softcopi KA-1468) MAK KA-1120 | Edition: 2021 | Type: Karya Akhir (KA)
Find Similar |  Add To Favorites |  Detail in New Window 
Analisis tingkat kematangan manajemen proyek menggunakan project management maturity model: studi kasus PT Anabatic Technologies
Author: Filip Stephanus Khurniawan; | Call Number: KA-1458 (Softcopy KA-1446) MAK KA-1098 | Edition: 2021 | Type: Karya Akhir (KA)
Find Similar |  Add To Favorites |  Detail in New Window 
Analisis tingkat kematangan manajemen proyek berdasarkan project management maturity model dan COBIT 5: studi kasus lembaga ABC
Author: Keri Wiroprabowo; | Call Number: KA-684 (Softcopy KA-682) MAK KA-343 | Edition: 2015 | Type: Karya Akhir (KA)
Find Similar |  Add To Favorites |  Detail in New Window 
Prev   1 2 3 4 5 6 7 8 9 10  Next