Library Automation and Digital Archive
LONTAR
Fakultas Ilmu Komputer
Universitas Indonesia

Pencarian Sederhana

Find Similar Add to Favorite

Call Number KA-813 (Softcopy KA-812) MAK KA-470
Collection Type Karya Akhir (KA)
Title Perancangan disaster recovery plan (DRP): studi kasus Badan pusat statistik
Author Fadhilla Permitasari;
Publisher Jakarta : Program Studi Magister Teknologi Informasi Fasilkom UI, 2016
Subject Disaster Recovery Plan
Location FASILKOM-UI;
Lokasi : Perpustakaan Fakultas Ilmu Komputer
Nomor Panggil ID Koleksi Status
KA-813 (Softcopy KA-812) MAK KA-470 Indonesia TERSEDIA
Tidak ada review pada koleksi ini: 43318
BPS-Statistics Indonesia is one of the government agencies that provides public services. Public services provided by BPS is census and survey data presentation. In carrying out the functions to provide these public services, BPS is supported by information and communication technology (ICT). ICT for government sector is regulated by Peraturan Pemerintah RI No. 82 Year 2012 on the Implementation System and Electronic Transactions. One article, namely article 17, paragraph 1 says that the Electronic System for public services shall have a continuity plan activities to cope with disruption or disaster. In addition, Article 20 says that every operator of electronic systems is required to have procedures and mechanisms for securing electronic systems. However, until now, BPS has not had a disaster plan that includes procedures and mechanisms for securing electronic systems. Currently, BPS is focusing on building a disaster recovery center (DRC). To deal with catastrophic conditions are required disaster recovery plan (DRP) that describes the procedure for disaster management and infrastructure specifications for DRC. To meet the needs of the BPS, this study sought to design documents of disaster overcoming plan or disaster recovery plan (DRP) in BPS. DRP development refers to the standard BCI Good Practice Guidelines 2008 as the standard describes in detail every stage of development as well as methods that can be used. Result of this research is DRP document in accordance with the needs of the BPS. The document contains the roles and responsibilities of each person, strategy for business continuity, procedures for handling the disaster as well as capacity planning for the DRC. DRP is expected to run well, so that BPS can maintain business continuity in case of disaster.