Judul Artikel Transient Analysis 150 kV Shunt Reactor at Bulukumba Substation
Nama Prosiding Proceeding of the 2011 International Conference on Electrical Engineering and Informatics
Bahasa Eng
Abstrak English Abstract- This paper presents the study of the transient phenomena originating from the shunt reactor energizing and deenergizing at the Bulukumba Substation. The unsymmetrical phase inrush current during a shunt reactor energizing and over voltages provoked by current chopping are analyzed. Unsymmetrical phase inrush current that occur at shunt reactor energizing depend on the time in the time instant of circuit breaker pole operation with respect to the reference signal. At shun reactor with solidly grounded neutral, unsymmetrical currents cause zero sequence current to flow which may activate ground fault relay (mal-operation). In the interruption of reactor current (de-energizing), excessive over voltages across the circuit breaker due to current chopping can occur and the magnitude of the over voltages will also depend on the time of circuit breaker pole operation. In order to avoid mal-operation of relay ground faults, good setting of relay can be applied for shunt reactor protection especially ground fault relay. As for the case of current chopping over voltages , the surge arrester will protect adequately the reactor and the circuit breaker against the maximum phase-to-ground peak voltage.
Kata Kunci Shunt rector, inrush current, overvoltages, surge arrester, ATP/EMTP
Tahun 2011
No. Panggil SEM-368
Lokasi : Perpustakaan Fakultas Ilmu Komputer
Nomor Panggil ID Koleksi Status
SEM-368 TERSEDIA
Tidak ada review pada koleksi ini: 47427
Abstract- This paper presents the study of the transient phenomena originating from the shunt reactor energizing and deenergizing at the Bulukumba Substation. The unsymmetrical phase inrush current during a shunt reactor energizing and over voltages provoked by current chopping are analyzed. Unsymmetrical phase inrush current that occur at shunt reactor energizing depend on the time in the time instant of circuit breaker pole operation with respect to the reference signal. At shun reactor with solidly grounded neutral, unsymmetrical currents cause zero sequence current to flow which may activate ground fault relay (mal-operation). In the interruption of reactor current (de-energizing), excessive over voltages across the circuit breaker due to current chopping can occur and the magnitude of the over voltages will also depend on the time of circuit breaker pole operation. In order to avoid mal-operation of relay ground faults, good setting of relay can be applied for shunt reactor protection especially ground fault relay. As for the case of current chopping over voltages , the surge arrester will protect adequately the reactor and the circuit breaker against the maximum phase-to-ground peak voltage.